Skip to main content
MANUFACTURING · TECHNICAL SUPPORT

From Customer Drawings to Production Planning

Send your CAD drawings, dimensions, finish references or project schedule for technical review. We turn them into a production-ready cabinetry package with clear specifications, BOM and delivery plan.

04 — TECHNICAL SUPPORT

From customer drawings to production planning

Send your CAD drawings, dimensions, finish references or project schedule for technical review.

01

Drawing Review

Review the supplied drawings, dimensions and project requirements.

02

Technical Development

Clarify construction details, dimensions and finish specifications.

03

Cabinet Breakdown

Plan cabinet units, components and hardware requirements.

04

BOM Preparation

Prepare a Bill of Materials and production information for confirmation.

BOARD SUPPLIERS

Trusted board suppliers behind our cabinetry

Panels are sourced from established panel brands; grades, finishes and certifications are verified against each project specification.

01

Banboshi

Multifunctional engineered multilayer panels. Multilayer five-ply panels with ENF+ emission; flame-retardant, moisture- and insect-resistant, with anti-deformation construction.

02

Karrisen®

Decorative panels & OSB substrates. A brand of BNBMG Forests (Beixin Wood Industry): melamine-faced particle board and decorative panels, third-party tested by the National Center for Inspection of Wood-Based Panels, CAF.

05 — RISK MANAGEMENT

Reduce avoidable errors before they reach the site

Clear documentation and checkpoints help overseas partners manage the risks of sourcing cabinetry remotely.

  • Specification mismatch

    Confirm materials, finishes, dimensions and hardware before production.

  • Drawing-to-site gaps

    Review drawings and flag unclear dimensions or potential conflicts early.

  • Quality variation

    Use agreed samples and project specifications as the reference for inspection.

  • Missing or mixed components

    Agree labeling and hardware-packing requirements before the order is packed.

  • Communication gaps

    Record approvals, revisions and key changes in writing.

08 — QUALITY ASSURANCE

Quality checks built around agreed specifications

Inspection points should be defined for each project and documented against approved drawings, samples and specifications.

01

Material confirmation

Check board type, thickness, finish and approved samples.

02

First-article review

Confirm the first unit or sample against agreed drawings and details.

03

In-process checks

Review dimensions, machining, edge finishing and assembly as applicable.

04

Pre-packing inspection

Check finished components and packing condition before dispatch.

PLEASE NOTECertifications are project-specific

Destination-specific certifications, test reports and warranty terms must be confirmed for each project before order.

07 — DELIVERY PACKAGING

Choose a delivery format to suit the project

Packing and delivery arrangements are agreed based on destination, transport and installation requirements.

INSIGHTFlat-Pack

Cabinet components packed flat for efficient handling and international transportation. Room / unit labeling, hardware separation and export protection can be specified and confirmed for each order.

Flat-pack cabinetry cartons labeled and stacked for export

Flat-Pack Cartons

Components are packed flat, labeled by room or unit and protected for long-distance transport.

Bagged hardware and fittings separated for flat-pack delivery

Hardware Separation

Fittings and hardware are bagged and separated to protect finishes and simplify on-site assembly.

10— NEXT STEP

Send your drawings, get a quotation.

Tell us the room types and quantities. We reply with pricing, lead time and a production drawing for approval.

Request a Quote

CAPTCHA

By submitting you agree to be contacted about this inquiry. Your phone number is encrypted at rest.