01— PRODUCT RANGE
Office Pantries & Tea Points
Pantry runs with sinks, appliances and storage.
Pantry and tea-point runs with base units, tall appliance housings, open shelving and waste sorting. Sink, tap and appliance cut-outs are made to the equipment schedule.
Frequently asked questions
What is the minimum order quantity?
One set for most ranges. A single kitchen or a single wardrobe can be produced; there is no container minimum. Freight is more economical when several units ship together.
How long does production take?
Typically 30–45 days after the production drawing is approved and the deposit is received. Sea freight is additional and depends on the destination port. The exact lead time is stated in the quotation.
Do you install overseas?
No. We manufacture to your drawings and ship; installation is handled by your local team. We supply assembly drawings and a hardware pack for each unit.
Can you work from hand sketches?
Yes. Send dimensions and a sketch or a room list. We redraw the units for production and issue a drawing for your approval before cutting.

